Shallow Valley Storage
ERCOT queue ID 27INR0202
Shallow Valley Storage (27INR0202) is listed in the ERCOT interconnection queue as a 103.4 MW battery project in Ward County, TX. The filing names Tap Coyanosa - Blair Lake Sub as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 19, 2029. It records the screening study as complete on October 17, 2024 and the full interconnection study as approved on February 27, 2026.
| Queue ID | 27INR0202 |
|---|---|
| Project name | Shallow Valley Storage |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | Tap Coyanosa - Blair Lake Sub |
| Point of interconnection | Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub |
| County | Ward |
| State | TX |
| Voltage | 138 kV |
| Capacity | 103.4 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-04-19 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Coyanosa - Blair Lake Sub substation: 2 requests in the ERCOT queue, 2 active totaling 605.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 26INR0230 | Titus Sienta Solar | 501.9 | Solar | SS Completed, FIS Completed, No IA |
Ward, TX: 13 requests in the ERCOT queue, 12 active totaling 3,247.7 MW.
Tracked changes
2 changes observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | Inactive → SS Completed, FIS Completed, No IA |
| 2026-09-07 | Terminal status | 103.4 | SS Completed, FIS Completed, No IA → Inactive |
Additional filed fields
| Interconnecting entity | Shallow Valley Storage, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2024-10-17 |
| Full interconnection study approved | 2026-02-27 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.