Substation Scout

Wilmington Solar Energy Project

PJM queue ID AG1-478

Wilmington Solar Energy Project (AG1-478) is listed in the PJM interconnection queue as a 15.9 MW hybrid project in Will County, IL. The filing names Wilmington as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2027.

Queue IDAG1-478
Project nameWilmington Solar Energy Project
Status (as published)Engineering and Procurement
SubstationWilmington
Point of interconnectionWilmington 34.5 kV
CountyWill
StateIL
Voltage34.5 kV
Capacity15.9 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2027-12-31
Source datasetserial

Same substation and county

Wilmington substation: 4 requests in the PJM queue, 1 active totaling 15.9 MW.

Queue IDProjectMWResourceStatus
V3-013Wilmington 69kV7.6SolarWithdrawn
W4-033Lincoln Solar3.8SolarWithdrawn
AC1-032Wilmington0SolarWithdrawn

Will, IL: 66 requests in the PJM queue, 22 active totaling 3,615.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy19.9
MW capacity15.9
MFO19.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first