Substation Scout

Martinsville-Wilmington substation interconnection queue

2 active projects totalling 29.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
29.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
AD1-147 Martinsville-Wilmington 69 kV 69 30 Solar Withdrawn
AD2-031 Clinton Solar 69 19 Solar In Service
AF1-159 Clinton Solar 69 10.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.