Martinsville-Wilmington substation interconnection queue
2 active projects totalling 29.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
29.9active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD1-147 | Martinsville-Wilmington 69 kV | 69 | 30 | Solar | Withdrawn |
| AD2-031 | Clinton Solar | 69 | 19 | Solar | In Service |
| AF1-159 | Clinton Solar | 69 | 10.9 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.