Clinton - Stuart substation interconnection queue
1 active project totalling 72 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
72active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-165 | Clinton - Stuart 345 kV | 345 | 72 | Solar | Withdrawn |
| C01-1659 | Clinton - Stuart 345 kV | 345 | 72 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.