1 active project totalling 72 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
72active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-165 Clinton - Stuart 345 kV 345 72 Solar Withdrawn
C01-1659 Clinton - Stuart 345 kV 345 72 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.