Clinton, OH interconnection queue

6 active projects totalling 281.9 MW in the PJM queue, plus 5 with terminal status (shown greyed).

6active projects
281.9active MW
11total filed
Queue IDProjectkVMWResourceStatus
AE2-221 Yellow Wood Solar Energy Center 345 180 Solar Under Construction
AF2-113 Clinton-Stuart 345 kV 345 75 Battery Withdrawn
AI2-165 Clinton - Stuart 345 kV 345 72 Solar Withdrawn
C01-1659 Clinton - Stuart 345 kV 345 72 Solar Active
AD1-147 Martinsville-Wilmington 69 kV 69 30 Solar Withdrawn
AD2-031 Clinton Solar 69 19 Solar In Service
W4-035 Martinsville n/r 11.9 Solar Withdrawn
AF1-159 Clinton Solar 69 10.9 Solar In Service
V3-013 Wilmington 69kV 69 7.6 Solar Withdrawn
AA1-099 Clinton County Energy Storage Project 34.5 0 Battery In Service
Z1-080 Clinton County Energy Storage Project 34.5 0 Battery In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.