Wempletown substation interconnection queue
2 active projects totaling 100 MW in the PJM queue, plus 11 with terminal status (shown grayed).
13 PJM queue filings name Wempletown as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Nov 2006 to Dec 2029 (13 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2206 | Wempletown 345 kV | 345 | 511.1 | Battery | Withdrawn | Jun 2028 |
| AD2-102 | Wempletown 345 kV | 345 | 120 | Solar | Withdrawn | Dec 2021 |
| AH1-232 | Wempletown 138 kV | 138 | 105 | Solar | Withdrawn | Jul 2025 |
| AH2-338 | Wempletown 138 kV | 138 | 96 | Solar | Withdrawn | Jul 2027 |
| AH1-233 | Wempletown 138 kV | 138 | 70 | Battery | Withdrawn | Jul 2025 |
| AH2-339 | Wempletown 138 kV | 138 | 64 | Battery | Withdrawn | Jul 2027 |
| AD2-168 | Wempletown 138 kV | 138 | 57 | Hybrid | Withdrawn | Sep 2020 |
| AE1-023 | Wempletown | n/r | 57 | Hybrid | Withdrawn | Dec 2021 |
| C01-1796 | Wempletown 345 kV | 345 | 50 | Solar | Active | Dec 2029 |
| C01-2112 | Wempletown 345 kV | 345 | 50 | Solar | Active | Dec 2029 |
| M09_CE28 | Wempletown 345kV | 345 | 40 | Wind | Withdrawn | Nov 2006 |
| AH1-234 | Wempletown 345 kV | 345 | 29.1 | Solar | Withdrawn | Dec 2028 |
| U2-003 | Wempletown | n/r | 26 | Wind | Withdrawn | Sep 2010 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Wempletown (COMED, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Winnebago County, IL
- Rockford: 2 active, 60 MW of 2 filed
- Rockford II: 2 active, 27 MW of 3 filed
- Blackhawk: 1 active, 6.4 MW of 2 filed
- Sabrooke: 1 active, 6 MW of 2 filed
- Stillman Valley: none active of 4 filed
Other PJM queue substations in Stephenson County, IL
- Lena: 3 active, 62 MW of 7 filed
- Lena - Freeport: 1 active, 14.4 MW of 2 filed
- Lancaster: none active of 4 filed
- Garden Plain - Rock Falls: none active of 2 filed
- Lancaster-Maryland: none active of 2 filed
- Lena - Lancaster: none active of 2 filed