Lena - Freeport substation interconnection queue
1 active project totaling 14.4 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Lena - Freeport as the point of interconnection, all in Stephenson County, IL.
Target commercial operation dates as filed run from Apr 2027 to Oct 2029 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: ComEd (1 filing).
1active projects
14.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1324 | Lena - Freeport 34.5 kV | 34.5 | 14.4 | Solar | Active | Oct 2029 |
| AI1-173 | Lena - Freeport 34.5 kV | 34.5 | 9.6 | Solar | Withdrawn | Apr 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Stephenson County, IL
- Wempletown: 2 active, 100 MW of 13 filed
- Lena: 3 active, 62 MW of 7 filed
- Lancaster: none active of 4 filed
- Garden Plain - Rock Falls: none active of 2 filed
- Lancaster-Maryland: none active of 2 filed
- Lena - Lancaster: none active of 2 filed