Lena - Freeport substation interconnection queue

1 active project totalling 14.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
14.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1324 Lena - Freeport 34.5 kV 34.5 14.4 Solar Active
AI1-173 Lena - Freeport 34.5 kV 34.5 9.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.