Winnebago, IL interconnection queue

11 active projects totalling 815 MW in the PJM queue, plus 17 with terminal status (shown greyed).

11active projects
815active MW
28total filed
Queue IDProjectkVMWResourceStatus
C01-2206 Wempletown 345 kV 345 511.1 Battery Withdrawn
C01-2242 Cherry Valley - ESS B200 138 kV 138 200 Hybrid Active
C01-2243 Cherry Valley - Belvidere 138 kV 138 200 Hybrid Active
AH1-564 Rockford II 138 kV 138 150 Battery Active
AD2-102 Wempletown 345 kV 345 120 Solar Withdrawn
AH1-232 Wempletown 138 kV 138 105 Solar Withdrawn
AH2-338 Wempletown 138 kV 138 96 Solar Withdrawn
AG2-516 Pecatonica 138kV 138 72 Solar Active
AH1-233 Wempletown 138 kV 138 70 Battery Withdrawn
AH2-339 Wempletown 138 kV 138 64 Battery Withdrawn
AC2-173 Wempleton-Belvidere n/r 60.8 Solar Withdrawn
AD2-168 Wempletown 138 kV 138 57 Hybrid Withdrawn
AE1-023 Wempletown n/r 57 Hybrid Withdrawn
C01-1796 Wempletown 345 kV 345 50 Solar Active
C01-2112 Wempletown 345 kV 345 50 Solar Active
AC2-115 Rockford I Energy Center n/r 40 Gas In Service
M09_CE28 Wempletown 345kV 345 40 Wind Withdrawn
O49 Wempletown-Byron 345kV 345 40 Wind Withdrawn
AH1-234 Wempletown 345 kV 345 29.1 Solar Withdrawn
AE2-077 Pierpoint-Freeport n/r 26.6 Solar Withdrawn
AC1-113 Rockford I Energy Center n/r 20 Gas In Service
AC1-114 Rockford II Energy Center n/r 20 Gas In Service
W3-132 Stillman Valley n/r 7.4 Solar Withdrawn
W2-079 Stillman Valley n/r 7.4 Solar Withdrawn
AC2-116 Rockford II Energy Center n/r 7 Gas In Service
U4-030 Rockford II Energy Center 138 6 Gas In Service
AB1-146 Sabrooke 12kV 12 0 Battery Withdrawn
Z2-090 Blackhawk 12.5kV 12.5 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.