Rockford substation interconnection queue
2 active projects totaling 60 MW in the PJM queue.
2 PJM queue filings name Rockford as the point of interconnection, all in Winnebago County, IL.
Target commercial operation date as filed: Dec 2021 (2 filings).
2active projects
60active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC2-115 | Rockford I Energy Center | n/r | 40 | Gas | In Service | Dec 2021 |
| AC1-113 | Rockford I Energy Center | n/r | 20 | Gas | In Service | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Winnebago County, IL
- Wempletown: 2 active, 100 MW of 13 filed
- Rockford II: 2 active, 27 MW of 3 filed
- Blackhawk: 1 active, 6.4 MW of 2 filed
- Sabrooke: 1 active, 6 MW of 2 filed
- Stillman Valley: none active of 4 filed