Rockford II substation interconnection queue
2 active projects totaling 27 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Rockford II as the point of interconnection, all in Winnebago County, IL.
Target commercial operation dates as filed run from Jun 2021 to Jun 2029 (3 filings).
Transmission owner as filed: ComEd (1 filing).
2active projects
27active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-564 | Rockford II 138 kV | 138 | 150 | Hybrid | Withdrawn | Jun 2029 |
| AC1-114 | Rockford II Energy Center | n/r | 20 | Gas | In Service | Dec 2021 |
| AC2-116 | Rockford II Energy Center | n/r | 7 | Gas | In Service | Jun 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AH1-564 | Terminal status | 150 | Active → Withdrawn |
Other PJM queue substations in Winnebago County, IL
- Wempletown: 2 active, 100 MW of 13 filed
- Rockford: 2 active, 60 MW of 2 filed
- Blackhawk: 1 active, 6.4 MW of 2 filed
- Sabrooke: 1 active, 6 MW of 2 filed
- Stillman Valley: none active of 4 filed