Lancaster substation interconnection queue

1 active project totalling 250 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
250active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-1208 Lancaster 138 kV 138 250 Battery Active
AH2-204 Lancaster 138 kV 138 170 Battery Withdrawn
R64 Lancaster 138kV 138 40 Wind Withdrawn
AF2-267 Lancaster 138 kV 138 37.1 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.