Lena - Lancaster substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Lena - Lancaster as the point of interconnection, all in Stephenson County, IL.
Target commercial operation dates as filed run from Sep 2022 to May 2023 (2 filings).
Transmission owner as filed: ComEd (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-201 | Lena - Lancaster 138 kV | 138 | 51.4 | Hybrid | Withdrawn | May 2023 |
| AF1-314 | Lena - Lancaster 138 kV | 138 | 37.2 | Wind | Withdrawn | Sep 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Stephenson County, IL
- Wempletown: 2 active, 100 MW of 13 filed
- Lena: 3 active, 62 MW of 7 filed
- Lena - Freeport: 1 active, 14.4 MW of 2 filed
- Lancaster: none active of 4 filed
- Garden Plain - Rock Falls: none active of 2 filed
- Lancaster-Maryland: none active of 2 filed