Stephenson, IL interconnection queue
4 active projects totalling 306.4 MW in the PJM queue, plus 22 with terminal status (shown greyed).
4active projects
306.4active MW
26total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1208 | Lancaster 138 kV | 138 | 250 | Battery | Active |
| AH2-204 | Lancaster 138 kV | 138 | 170 | Battery | Withdrawn |
| AG1-005 | Corbin-Crescent Ridge 138 kV | 138 | 120 | Solar | Withdrawn |
| AH2-375 | Lena- Landcaster 138kV | 138 | 106 | Battery | Withdrawn |
| AI1-174 | Garden Plain - Rock Falls 138 kV | 138 | 94.4 | Hybrid | Withdrawn |
| AI2-243 | Ecogrove 138 kV (CIR Increase) | 138 | 80.3 | Hybrid | Withdrawn |
| AH2-372 | Corbin – Cresent Ridge 138kV | 138 | 52 | Battery | Withdrawn |
| AF2-201 | Lena - Lancaster 138 kV | 138 | 51.4 | Hybrid | Withdrawn |
| AH1-354 | Lena 138 kV | 138 | 40 | Battery | Withdrawn |
| R64 | Lancaster 138kV | 138 | 40 | Wind | Withdrawn |
| R96 | Lancaster-Maryland 138kV | 138 | 40 | Wind | Withdrawn |
| AF1-314 | Lena - Lancaster 138 kV | 138 | 37.2 | Wind | Withdrawn |
| AF2-267 | Lancaster 138 kV | 138 | 37.1 | Wind | Withdrawn |
| AI1-191 | Landcaster - Pecatonica 138 kV | 138 | 35.2 | Wind | Withdrawn |
| U2-003 | Wempletown | n/r | 26 | Wind | Withdrawn |
| R16 | Lena 138kV | 138 | 25.2 | Wind | Withdrawn |
| AD2-172 | High Point Solar | 138 | 21 | Solar | In Service |
| AE2-035 | High Point II Solar | 138 | 21 | Solar | In Service |
| K02_CE18 | Baileyville Wind Farm | n/r | 16 | Wind | Withdrawn |
| K04_CE17 | Lena Wind Farm | n/r | 16 | Wind | Withdrawn |
| K04_CE19 | Freeport Wind Farm | n/r | 16 | Wind | Withdrawn |
| C01-1324 | Lena - Freeport 34.5 kV | 34.5 | 14.4 | Solar | Active |
| AH1-353 | Lena 138 kV | 138 | 12 | Solar | Withdrawn |
| AF1-060 | Lena 138 kV | 138 | 10.3 | Battery | Withdrawn |
| AI1-173 | Lena - Freeport 34.5 kV | 34.5 | 9.6 | Solar | Withdrawn |
| L01_CE21 | Pearl City Wind Farm | n/r | 3 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.