Sabrooke substation interconnection queue
1 active project totalling 6 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U4-030 | Rockford II Energy Center | 138 | 6 | Gas | In Service |
| AB1-146 | Sabrooke 12kV | 12 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.