Lena substation interconnection queue

3 active projects totalling 62 MW in the PJM queue, plus 4 with terminal status (shown greyed).

3active projects
62active MW
7total filed
Queue IDProjectkVMWResourceStatus
AH1-354 Lena 138 kV 138 40 Battery Withdrawn
R16 Lena 138kV 138 25.2 Wind Withdrawn
AD2-172 High Point Solar 138 21 Solar In Service
AE2-035 High Point II Solar 138 21 Solar In Service
P46 EcoGrove WF (67 WT) 138 20 Wind In Service
AH1-353 Lena 138 kV 138 12 Solar Withdrawn
AF1-060 Lena 138 kV 138 10.3 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.