Colora Tap substation interconnection queue
2 active projects totaling 930 MW in the PJM queue.
2 PJM queue filings name Colora Tap as the point of interconnection, all in Cecil County, MD.
Target commercial operation dates as filed run from Jun 2003 to Dec 2005 (2 filings).
2active projects
930active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| A29 | Rock Springs | n/r | 465 | Gas | In Service | Jun 2003 |
| A30 | Rock Springs | n/r | 465 | Gas | In Service | Dec 2005 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Cecil County, MD
- Rock Springs: 8 active, 1,037.7 MW of 10 filed
- Townsend: 1 active, 37.6 MW of 3 filed
- Colora: none active of 3 filed