New Castle Solar
PJM queue ID AB2-179
New Castle Solar (AB2-179) is listed in the PJM interconnection queue as a 37.6 MW solar project in New Castle County, DE. The filing names Townsend as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 16, 2022.
| Queue ID | AB2-179 |
|---|---|
| Project name | New Castle Solar |
| Status (as published) | In Service |
| Substation | Townsend |
| Point of interconnection | Townsend 138kV |
| County | New Castle |
| State | DE |
| Voltage | 138 kV |
| Capacity | 37.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-12-16 |
| Source dataset | serial |
Same substation and county
Townsend substation: 3 requests in the PJM queue, 1 active totaling 37.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-182 | Townsend 25kV | 14 | Solar | Withdrawn |
| W3-086 | Townsend 138kV | 3.8 | Solar | Withdrawn |
New Castle, DE: 65 requests in the PJM queue, 31 active totaling 1,405.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 50 |
| MW capacity | 37.6 |
| MFO | 50 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.