Colora substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-307 | Colora 230 kV | 230 | 60.5 | Battery | Withdrawn |
| AF2-208 | Colora 230 kV | 230 | 40.3 | Battery | Withdrawn |
| AB2-056 | Colora 34.5kV | 34.5 | 3.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.