Stony Creek Solar
PJM queue ID AF2-221
Stony Creek Solar (AF2-221) is listed in the PJM interconnection queue as a 6.3 MW solar project in Somerset County, PA. The filing names Scalp Level as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of October 1, 2025.
| Queue ID | AF2-221 |
|---|---|
| Project name | Stony Creek Solar |
| Status (as published) | Suspended |
| Substation | Scalp Level |
| Point of interconnection | Scalp Level 22.9 kV |
| County | Somerset |
| State | PA |
| Voltage | 22.9 kV |
| Capacity | 6.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-10-01 |
| Source dataset | serial |
Same substation and county
Scalp Level substation: 6 requests in the PJM queue, 1 active totaling 6.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| I15 | Scalp Level 115kV | 9.9 | Gas | Withdrawn |
| AG1-241 | Scalp Level 23 kV | 6.5 | Solar | Withdrawn |
| AH2-360 | Scalp Level 23 kV | 6.5 | Solar | Withdrawn |
| AF1-218 | Scalp Level 23 kV | 6.3 | Solar | Withdrawn |
| AG1-033 | Scalp Level 23 kV | 3.2 | Solar | Withdrawn |
Somerset, PA: 107 requests in the PJM queue, 25 active totaling 286.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 15 |
| MW capacity | 6.3 |
| MFO | 15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.