Substation Scout

Casselman WF1

PJM queue ID L13

Casselman WF1 (L13) is listed in the PJM interconnection queue as a 8 MW wind project in Somerset County, PA. The filing names Rockwood as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 11, 2008.

Queue IDL13
Project nameCasselman WF1
Status (as published)In Service
SubstationRockwood
Point of interconnectionRockwood
CountySomerset
StatePA
VoltageNot reported
Capacity8 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2008-01-11
Source datasetserial

Same substation and county

Rockwood substation: 5 requests in the PJM queue, 1 active totaling 8 MW.

Queue IDProjectMWResourceStatus
AG1-205Rockwood 23 kV6.5SolarWithdrawn
AG2-434Rockwood 23 kV6SolarWithdrawn
AH2-359Rockwood 23kV3.2SolarWithdrawn
L11Rockwood 25 kV2WindWithdrawn

Somerset, PA: 107 requests in the PJM queue, 25 active totaling 286.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy40
MW capacity8
MFO40

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.