Top Crop Generating Facility

PJM queue ID O22

Top Crop Generating Facility (O22) is listed in the PJM interconnection queue as a 60 MW wind project in Livingston County, IL. The filing names Powerton-Goodings Grove as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 25, 2010.

Queue IDO22
Project nameTop Crop Generating Facility
Status (as published)In Service
SubstationPowerton-Goodings Grove
Point of interconnectionPowerton-Goodings Grove 345kV
CountyLivingston
StateIL
Voltage345 kV
Capacity60 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2010-10-25
Source datasetserial

Same substation and county

Powerton-Goodings Grove substation: 4 requests in the PJM queue, 2 active totaling 79.5 MW.

Queue IDProjectMWResourceStatus
AA1-018Otter Creek Wind Farm19.5WindIn Service
O27Powerton-Goodings Grove 345kV60GasWithdrawn
W2-046Powerton-Goodings Grove 345kV58.5WindWithdrawn

Livingston, IL: 47 requests in the PJM queue, 13 active totaling 1,544.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy300
MW capacity60
MFO300

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.