Timber Switch substation interconnection queue
1 active project totaling 20 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Timber Switch as the point of interconnection, all in Paulding County, OH.
Target commercial operation dates as filed run from Oct 2019 to Dec 2029 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-522 | Timber Switch 138 kV | 138 | 28.2 | Solar | Withdrawn | Dec 2024 |
| AF2-376 | Timber Road II WF | 138 | 20 | Battery | EP | Dec 2029 |
| AC1-176 | Timber Switch 138kV | 138 | 7.6 | Wind | Withdrawn | Oct 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Timber Switch (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Paulding County, OH
- Maddox Creek-RP Mone: 2 active, 280 MW of 4 filed
- Logtown: 3 active, 59.8 MW of 4 filed
- Haviland: 3 active, 33.8 MW of 5 filed
- Payne: 2 active, 30 MW of 4 filed
- Lincoln-Sterling: 1 active, 30 MW of 3 filed
- Haviland - Milan: 1 active, 30 MW of 2 filed