Timber Switch substation interconnection queue

1 active project totaling 20 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Timber Switch as the point of interconnection, all in Paulding County, OH.

Target commercial operation dates as filed run from Oct 2019 to Dec 2029 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEP (1 filing).

1active projects
20active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-522 Timber Switch 138 kV 138 28.2 Solar Withdrawn Dec 2024
AF2-376 Timber Road II WF 138 20 Battery EP Dec 2029
AC1-176 Timber Switch 138kV 138 7.6 Wind Withdrawn Oct 2019

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Timber Switch (AEP, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Paulding County, OH

All 28 PJM queue filings in Paulding County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first