Maddox Creek-RP Mone substation interconnection queue
2 active projects totalling 280 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
280active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-410 | Butterfly Meadows | 345 | 180 | Solar | EP |
| AG1-411 | Butterfly Meadows | 345 | 100 | Battery | EP |
| AI2-366 | Maddox Creek-RP Mone 345 kV | 345 | 93.6 | Solar | Withdrawn |
| T130 | Maddox Creek-RP Mone 345 kV | 345 | 60 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.