Maddox Creek-RP Mone substation interconnection queue

2 active projects totalling 280 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
280active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-410 Butterfly Meadows 345 180 Solar EP
AG1-411 Butterfly Meadows 345 100 Battery EP
AI2-366 Maddox Creek-RP Mone 345 kV 345 93.6 Solar Withdrawn
T130 Maddox Creek-RP Mone 345 kV 345 60 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.