Maddox Creek-RP Mone substation interconnection queue
2 active projects totaling 280 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Maddox Creek-RP Mone as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Dec 2016 to Feb 2030 (4 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (2 filings).
2active projects
280active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-410 | Butterfly Meadows | 345 | 180 | Solar | EP | Feb 2030 |
| AG1-411 | Butterfly Meadows | 345 | 100 | Battery | EP | Feb 2030 |
| AI2-366 | Maddox Creek-RP Mone 345 kV | 345 | 93.6 | Solar | Withdrawn | Sep 2024 |
| T130 | Maddox Creek-RP Mone 345 kV | 345 | 60 | Wind | Withdrawn | Dec 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Van Wert County, OH
- Maddox Creek: 3 active, 113.2 MW of 4 filed
- Convoy-East Lima: 1 active, 70 MW of 2 filed
- Southwest Lima: none active of 6 filed
- Marysville-Sorenson: none active of 5 filed
- Haviland – Cavett Switch: none active of 3 filed
- Cavett Switch - West Van Wert: none active of 2 filed
Other PJM queue substations in Paulding County, OH
- Logtown: 3 active, 59.8 MW of 4 filed
- Haviland: 3 active, 33.8 MW of 5 filed
- Payne: 2 active, 30 MW of 4 filed
- Lincoln-Sterling: 1 active, 30 MW of 3 filed
- Haviland - Milan: 1 active, 30 MW of 2 filed
- Timber Switch: 1 active, 20 MW of 3 filed
Site Scanner