Haviland - Milan substation interconnection queue
1 active project totalling 30 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
30active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-101 | Haviland - Milan 138kV | 138 | 42.6 | Wind | Withdrawn |
| R49 | Timber Road II WF | 138 | 30 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.