Haviland - Milan substation interconnection queue

1 active project totalling 30 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
30active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-101 Haviland - Milan 138kV 138 42.6 Wind Withdrawn
R49 Timber Road II WF 138 30 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.