Timber Road Solar Park
PJM queue ID AD1-119
Timber Road Solar Park (AD1-119) is listed in the PJM interconnection queue as a 19 MW solar project in Paulding County, OH. The filing names Payne as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 30, 2023.
| Queue ID | AD1-119 |
|---|---|
| Project name | Timber Road Solar Park |
| Status (as published) | In Service |
| Substation | Payne |
| Point of interconnection | Payne 69 kV |
| County | Paulding |
| State | OH |
| Voltage | 69 kV |
| Capacity | 19 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-11-30 |
| Source dataset | serial |
Same substation and county
Payne substation: 4 requests in the PJM queue, 2 active totaling 30 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-406 | Payne 69 kV | 11 | Solar | Active |
| AC2-181 | Payne 69kV | 19 | Solar | Withdrawn |
| AI2-117 | Payne 69 kV | 12 | Solar | Withdrawn |
Paulding, OH: 28 requests in the PJM queue, 12 active totaling 250.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 49.9 |
| MW capacity | 18.96 |
| MFO | 49.9 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.