Lincoln-Sterling substation interconnection queue
1 active project totaling 30 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Lincoln-Sterling as the point of interconnection, all in Paulding County, OH.
Target commercial operation dates as filed run from Dec 2017 to Feb 2023 (3 filings).
1active projects
30active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-102 | Lincoln-Sterling 138kV | 138 | 46.8 | Wind | Withdrawn | Feb 2023 |
| T131 | Timber Road III | 138 | 30 | Wind | In Service | Dec 2017 |
| AI2-091 | Lincoln-Sterling 138kV | 138 | 22.7 | Wind | Withdrawn | Feb 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Paulding County, OH
- Maddox Creek-RP Mone: 2 active, 280 MW of 4 filed
- Logtown: 3 active, 59.8 MW of 4 filed
- Haviland: 3 active, 33.8 MW of 5 filed
- Payne: 2 active, 30 MW of 4 filed
- Haviland - Milan: 1 active, 30 MW of 2 filed
- Timber Switch: 1 active, 20 MW of 3 filed