Lincoln-Sterling substation interconnection queue

1 active project totalling 30 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
30active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI2-102 Lincoln-Sterling 138kV 138 46.8 Wind Withdrawn
T131 Timber Road III 138 30 Wind In Service
AI2-091 Lincoln-Sterling 138kV 138 22.7 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.