Lincoln-Sterling substation interconnection queue
1 active project totalling 30 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
30active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-102 | Lincoln-Sterling 138kV | 138 | 46.8 | Wind | Withdrawn |
| T131 | Timber Road III | 138 | 30 | Wind | In Service |
| AI2-091 | Lincoln-Sterling 138kV | 138 | 22.7 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.