Logtown substation interconnection queue

3 active projects totalling 59.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

3active projects
59.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI2-092 Logtown 138 kV 138 40.3 Wind Withdrawn
AG1-369 Timber Road Solar Park III 138 29.9 Solar Engineering and Procurement
AF2-377 Timber Road Storage III 138 20 Battery Engineering and Procurement
AC1-173 Timber Road IV Wind Farm (Southern Phase) 138 9.9 Wind In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.