Oak Grove - West Moreland substation interconnection queue
2 active projects totaling 220 MW in the PJM queue.
2 PJM queue filings name Oak Grove - West Moreland as the point of interconnection, all in Westmoreland County, VA.
Target commercial operation date as filed: Dec 2032 (2 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
2active projects
220active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1601 | Oak Grove - West Moreland 230 kV | 230 | 120 | Solar | Active | Dec 2032 |
| C01-1602 | Oak Grove - West Moreland 230 kV | 230 | 100 | Battery | Active | Dec 2032 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Westmoreland County, VA
- Oak Grove: 6 active, 398.8 MW of 9 filed
- Westmoreland: 1 active, 13.2 MW of 5 filed
- Northern Neck: 3 active, 8.4 MW of 6 filed
- Westmoreland - Oak Grove: none active of 3 filed
- Oak Grove – Saunders DP: none active of 2 filed