Substation Scout

LaSalle-Braidwood substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
S62 LaSalle-Braidwood 345kV 345 100 Wind Withdrawn
AB1-170 LaSalle-Braidwood n/r 32.5 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.