Crescent Ridge-Corbin substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Crescent Ridge-Corbin as the point of interconnection, all in IL.
Target commercial operation dates as filed run from Sep 2022 to Aug 2024 (2 filings).
Transmission owner as filed: ComEd (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-318 | Crescent Ridge-Corbin | n/r | 52.8 | Wind | Withdrawn | Sep 2022 |
| AF2-128 | Crescent Ridge-Corbin 138 kV | 138 | 14 | Wind | Withdrawn | Aug 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Crescent Ridge-Corbin” in IL. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Crescent Ridge - Corbin: PJM interconnection queue (IL)
Other PJM queue substations in Putnam County, IL
- Crescent Ridge - Corbin: 2 active, 1,270 MW of 2 filed
- Kewanee-Streator: none active of 2 filed
Other PJM queue substations in Lasalle County, IL
- LaSalle: 4 active, 584 MW of 8 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Powerton-Nevada: 4 active, 172.4 MW of 4 filed
- Nevada: 1 active, 90 MW of 2 filed
- LaSalle 1: 1 active, 11.9 MW of 2 filed
- Mendota: none active of 4 filed
- LaSalle-Braidwood: none active of 2 filed
- Tazewell - AB1-122: none active of 2 filed