Collins substation interconnection queue

3 active projects totalling 1,140 MW in the PJM queue, plus 5 with terminal status (shown greyed).

3active projects
1,140active MW
8total filed
Queue IDProjectkVMWResourceStatus
S57 Collins n/r 1,500 Wind Withdrawn
AA2-035 Collins n/r 1,019.3 Gas Withdrawn
C01-1808 Collins 345 kV 345 940 Nuclear Active
T32 Collins n/r 925 Wind Withdrawn
C01-1576 Collins 345 kV 345 150 Battery Active
C01-1577 Collins 345 kV 345 50 Battery Active
S58 Collins n/r 0 Wind Withdrawn
U3-026 Collins n/r 0 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.