Substation Scout

Tazewell - AB1-122 substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-122 Tazewell - AB1-122 345 kV 345 67 Wind Withdrawn
AH1-003 Tazewell - AB1-122 345 kV 345 19.1 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.