LaSalle substation interconnection queue
4 active projects totalling 584 MW in the PJM queue, plus 4 with terminal status (shown greyed).
4active projects
584active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W1-040 | LaSalle | n/r | 350 | Nuclear | Withdrawn |
| Y1-005 | LaSalle | n/r | 350 | Nuclear | Withdrawn |
| C01-1571 | LaSalle 345 kV | 345 | 346 | Gas | Active |
| C01-1260 | LaSalle 345 kV | 345 | 170.8 | Nuclear | Active |
| P10 | Grand Ridge WF | 138 | 37.2 | Wind | In Service |
| AI2-178 | LaSalle 138 kV | 138 | 36.5 | Wind | Withdrawn |
| N15 | Grand Ridge Energy LLC | 138 | 30 | Wind | In Service |
| AI2-180 | LaSalle 138kV | 138 | 6.2 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.