Substation Scout

LaSalle 1 substation interconnection queue

1 active project totalling 11.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
11.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
T116 LaSalle 1 n/r 18 Nuclear Withdrawn
V1-024 LaSalle Nuclear Station Unit 1 n/r 11.9 Nuclear In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.