Substation Scout

Nevada substation interconnection queue

1 active project totaling 90 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Nevada as the point of interconnection, all in Lasalle County, IL.

Target commercial operation dates as filed run from Dec 2020 to May 2029 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ComEd (1 filing).

1active projects
90active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-142 Otter Creek Solar 345 90 Solar EP May 2029
AD1-116 Nevada 345 kV 345 7.6 Solar Withdrawn Dec 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Nevada (COMED, 4 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Lasalle County, IL

All 27 PJM queue filings in Lasalle County, IL.