Goose Lake substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W3-135 Dresden Island Lock & Dam 34.5 12.1 Hydro Withdrawn
W4-086 Morris Landfill 34.5 2.1 Gas Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.