Kendall substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Kendall as the point of interconnection, all in IL.
Target commercial operation dates as filed run from May 2016 to Jun 2021 (4 filings).
Transmission owner as filed: ComEd (1 filing).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AA1-048 | Kendall | n/r | 780 | Gas | Withdrawn | Dec 2018 |
| AB2-154 | Kendall 345kV | 345 | 65 | Gas | Withdrawn | May 2017 |
| AF2-034 | Kendall 345kV | 345 | 10.8 | Hybrid | Withdrawn | Jun 2021 |
| AA2-136 | Kendall | n/r | 10 | Gas | Withdrawn | May 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grundy County, IL
- Kendall-Tazewell & Dresden-Mole Creek: 2 active, 1,243 MW of 2 filed
- Collins: 3 active, 1,140 MW of 8 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Dresden: 4 active, 175 MW of 6 filed
- Morris: 2 active, 32.6 MW of 3 filed
- Goose Lake: none active of 2 filed
- LaSalle-Braidwood: none active of 2 filed
Other PJM queue substations in Kendall County, IL
- Plano - Lasco Station: 1 active, 300 MW of 2 filed
- Plano: 1 active, 250 MW of 6 filed
- Sandwich-Plano: 2 active, 167.5 MW of 5 filed
- Shorewood: none active of 2 filed