Kendall substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-048 | Kendall | n/r | 780 | Gas | Withdrawn |
| AB2-154 | Kendall 345kV | 345 | 65 | Gas | Withdrawn |
| AF2-034 | Kendall 345kV | 345 | 10.8 | Hybrid | Withdrawn |
| AA2-136 | Kendall | n/r | 10 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.