Dresden substation interconnection queue
4 active projects totaling 175 MW in the PJM queue, plus 2 with terminal status (shown grayed).
6 PJM queue filings name Dresden as the point of interconnection, all in Grundy County, IL.
Target commercial operation dates as filed run from Jan 2012 to Nov 2028 (6 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: ComEd (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-421 | Dresden 138kV | 138 | 230 | Battery | Withdrawn | Dec 2025 |
| Q49 | Dresden Nuclear Generating Station U2 | 345 | 70 | Nuclear | In Service | Jan 2012 |
| Q50 | Dresden Nuclear Station Unit 3 | 345 | 70 | Nuclear | In Service | Jan 2012 |
| C01-1053 | Dresden 345 kV | 345 | 32 | Nuclear | Active | Nov 2028 |
| X3-045 | Dresden | n/r | 32 | Nuclear | Withdrawn | Jun 2014 |
| X1-045 | Dresden Nuclear Generation Station, Units 2 & 3 | n/r | 3 | Nuclear | In Service | Dec 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Dresden (COMED, 6 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Grundy County, IL
- Kendall-Tazewell & Dresden-Mole Creek: 2 active, 1,243 MW of 2 filed
- Collins: 3 active, 1,140 MW of 8 filed
- Katydid Road: 4 active, 185.1 MW of 5 filed
- Morris: 2 active, 32.6 MW of 3 filed
- Kendall: none active of 4 filed
- Goose Lake: none active of 2 filed
- LaSalle-Braidwood: none active of 2 filed