Substation Scout

King William, VA interconnection queue

2 active projects totalling 55.3 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
55.3active MW
6total filed
Queue IDProjectkVMWResourceStatus
AG1-134 Kings Dominion DP 115 kV 115 60 Solar Withdrawn
AG2-007 Lanexa-Dunnsville 230 kV 230 60 Solar Withdrawn
AD1-105 Sweet Sue Solar 115 44.4 Solar Under Construction
AH2-186 Enfield 12kV 12 13.6 Solar Withdrawn
AC1-112 Hollyfield Solar Facility 34.5 10.9 Solar In Service
AC2-070 Hollyfield II 34.5 9.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.