Adams Solar LLC
PJM queue ID AD1-020
Adams Solar LLC (AD1-020) is listed in the PJM interconnection queue as a 53.6 MW solar project in Adams County, PA. The filing names Hunterstown-Lincoln as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 25, 2024.
| Queue ID | AD1-020 |
|---|---|
| Project name | Adams Solar LLC |
| Status (as published) | In Service |
| Substation | Hunterstown-Lincoln |
| Point of interconnection | Hunterstown-Lincoln 115 kV |
| County | Adams |
| State | PA |
| Voltage | 115 kV |
| Capacity | 53.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-02-25 |
| Source dataset | serial |
Same substation and county
Hunterstown-Lincoln substation: 2 requests in the PJM queue, 1 active totaling 53.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-071 | Hunterstown-Lincoln 115kV | 68 | Solar | Withdrawn |
Adams, PA: 86 requests in the PJM queue, 13 active totaling 2,270.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 80 |
| MW capacity | 53.6 |
| MFO | 80 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.