Galion-South Berwick substation interconnection queue
1 active project totaling 72 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Galion-South Berwick as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Aug 2027 to Dec 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
72active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-229 | Tymochtee Solar | 345 | 72 | Solar | Under Construction | Aug 2027 |
| AG2-149 | Galion-South Berwick 345 kV | 345 | 52 | Solar | Withdrawn | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wyandot County, OH
- Forest: none active of 3 filed
- S Berwick - Galion: none active of 2 filed
Other PJM queue substations in Crawford County, OH
- Bucyrus Center: 1 active, 150 MW of 2 filed
- Chatfield-Howard: 1 active, 53.6 MW of 2 filed
- Chatfield: none active of 4 filed