S Berwick - Galion substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name S Berwick - Galion as the point of interconnection, all in Wyandot County, OH.

Target commercial operation date as filed: Dec 2028 (2 filings).

Transmission owner as filed: AEP (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-329 S Berwick - Galion 345 kV 345 156 Battery Withdrawn Dec 2028
AG2-148 S Berwick - Galion 345 kV 345 0 Battery Withdrawn Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AG2-329Terminal status156 Active → Withdrawn

Other PJM queue substations in Wyandot County, OH

All 8 PJM queue filings in Wyandot County, OH.