S Berwick - Galion substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name S Berwick - Galion as the point of interconnection, all in Wyandot County, OH.
Target commercial operation date as filed: Dec 2028 (2 filings).
Transmission owner as filed: AEP (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-329 | S Berwick - Galion 345 kV | 345 | 156 | Battery | Withdrawn | Dec 2028 |
| AG2-148 | S Berwick - Galion 345 kV | 345 | 0 | Battery | Withdrawn | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AG2-329 | Terminal status | 156 | Active → Withdrawn |
Other PJM queue substations in Wyandot County, OH
- Galion-South Berwick: 1 active, 72 MW of 2 filed
- Forest: none active of 3 filed