Substation Scout

Wyandot, OH interconnection queue

2 active projects totalling 228 MW in the PJM queue, plus 6 with terminal status (shown greyed).

2active projects
228active MW
8total filed
Queue IDProjectkVMWResourceStatus
AG2-329 S Berwick - Galion 345 kV 345 156 Battery Active
AF1-229 Tymochtee Solar 345 72 Solar Under Construction
AI2-218 Galion - South Berwick 345 kV 345 43.4 Solar Withdrawn
Y1-030 Forest 69kV 69 13 Wind Withdrawn
AH1-339 West Crawford 69 kV 69 6.8 Solar Withdrawn
Y2-057 Wyandot 13kV 13 3 Gas Withdrawn
AG2-148 S Berwick - Galion 345 kV 345 0 Battery Withdrawn
X1-033 NCEC Sycamore 69/12.47kV 12.5 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.