Bluestone Farm Solar

PJM queue ID AB2-043

Bluestone Farm Solar (AB2-043) is listed in the PJM interconnection queue as a 18.9 MW solar project in Mecklenburg County, VA. The filing names Chase City as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 8, 2021.

Queue IDAB2-043
Project nameBluestone Farm Solar
Status (as published)In Service
SubstationChase City
Point of interconnectionChase City 115kV
CountyMecklenburg
StateVA
Voltage115 kV
Capacity18.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2021-04-08
Source datasetserial

Same substation and county

Chase City substation: 7 requests in the PJM queue, 1 active totaling 18.9 MW.

Queue IDProjectMWResourceStatus
AH1-450Chase City 115kV50BatteryWithdrawn
AB2-090Chase City 34.5kV23.8SolarWithdrawn
AC1-106Chase City 115kV15.7SolarWithdrawn
AE2-258Chase City 115 kV14.1SolarWithdrawn
AB2-176Chase City 34.5kV9.8SolarWithdrawn
AG2-019Chase City 12.5 kV6BatteryWithdrawn

Mecklenburg, VA: 61 requests in the PJM queue, 14 active totaling 990.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy49.9
MW capacity18.9
MFO49.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first