Buckingham-Bremo substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AI1-015 Buckingham-Bremo 230 kV 230 320 Solar Withdrawn
AI2-026 Buckingham-Bremo 230 kV 230 60 Solar Withdrawn
AI2-027 Buckingham-Bremo 230 kV 230 50 Battery Withdrawn
AG2-169 Buckingham-Bremo 230 kV 230 46.7 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.