Buckingham-Bremo substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-015 | Buckingham-Bremo 230 kV | 230 | 320 | Solar | Withdrawn |
| AI2-026 | Buckingham-Bremo 230 kV | 230 | 60 | Solar | Withdrawn |
| AI2-027 | Buckingham-Bremo 230 kV | 230 | 50 | Battery | Withdrawn |
| AG2-169 | Buckingham-Bremo 230 kV | 230 | 46.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.