Scottsville - CVEC Delivery Point substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-368 | Scottsville - CVEC Delivery 69 kV Point | 69 | 27 | Solar | Withdrawn |
| AH2-057 | Scottsville - CVEC Delivery Point 46 kV | 46 | 17.9 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.