Scottsville - Bremo substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Scottsville - Bremo as the point of interconnection, all in Buckingham County, VA.
Target commercial operation dates as filed run from Mar 2024 to Dec 2025 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-214 | Scottsville - Bremo 138 kV | 138 | 55 | Solar | Withdrawn | Dec 2025 |
| AG2-572 | Scottsville - Bremo 138 kV | 138 | 30 | Solar | Withdrawn | Mar 2024 |
| AG2-573 | Scottsville - Bremo 138 kV | 138 | 12 | Battery | Withdrawn | Mar 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Buckingham County, VA
- Bremo: 3 active, 2,185 MW of 4 filed
- Bremo-Scottsville: 1 active, 89.7 MW of 2 filed
- Bear Garden: 2 active, 83.2 MW of 2 filed
- Curdsville-Willis Mtn: 1 active, 60 MW of 2 filed
- Buckingham: 1 active, 13.5 MW of 2 filed
- Buckingham-Bremo: none active of 4 filed
- Curdsville DP-Willis Mt.: none active of 3 filed
- Scottsville - CVEC Delivery Point: none active of 2 filed