Substation Scout

Scottsville - Bremo substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Scottsville - Bremo as the point of interconnection, all in Buckingham County, VA.

Target commercial operation dates as filed run from Mar 2024 to Dec 2025 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-214 Scottsville - Bremo 138 kV 138 55 Solar Withdrawn Dec 2025
AG2-572 Scottsville - Bremo 138 kV 138 30 Solar Withdrawn Mar 2024
AG2-573 Scottsville - Bremo 138 kV 138 12 Battery Withdrawn Mar 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Buckingham County, VA

All 27 PJM queue filings in Buckingham County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first