Bremo-Scottsville substation interconnection queue
1 active project totaling 89.7 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Bremo-Scottsville as the point of interconnection, all in Buckingham County, VA.
Target commercial operation dates as filed run from Oct 2023 to Nov 2027 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
89.7active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-108 | Riverstone Solar | 138 | 89.7 | Solar | Under Construction | Nov 2027 |
| AG1-426 | Bremo-Scottsville 138 kV | 138 | 17 | Battery | Withdrawn | Oct 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Buckingham County, VA
- Bremo: 3 active, 2,185 MW of 4 filed
- Bear Garden: 2 active, 83.2 MW of 2 filed
- Curdsville-Willis Mtn: 1 active, 60 MW of 2 filed
- Buckingham: 1 active, 13.5 MW of 2 filed
- Buckingham-Bremo: none active of 4 filed
- Curdsville DP-Willis Mt.: none active of 3 filed
- Scottsville - Bremo: none active of 3 filed
- Scottsville - CVEC Delivery Point: none active of 2 filed