Substation Scout

Bremo-Scottsville substation interconnection queue

1 active project totalling 89.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
89.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE1-108 Riverstone Solar 138 89.7 Solar Under Construction
AG1-426 Bremo-Scottsville 138 kV 138 17 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.