Substation Scout

Curdsville DP-Willis Mt. substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-432 Curdsville DP-Willis Mt. 115 kV 115 120 Solar Withdrawn
AG2-643 Curdsville DP-Willis Mt. 115 kV 115 80 Battery Withdrawn
AG1-451 Curdsville DP-Willis Mt. 115 kV 115 20 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.