Curdsville DP-Willis Mt. substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Curdsville DP-Willis Mt. as the point of interconnection, all in Buckingham County, VA.
Target commercial operation dates as filed run from Dec 2022 to Apr 2025 (3 filings).
Transmission owner as filed: Dominion (2 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-432 | Curdsville DP-Willis Mt. 115 kV | 115 | 120 | Solar | Withdrawn | Dec 2024 |
| AG2-643 | Curdsville DP-Willis Mt. 115 kV | 115 | 80 | Battery | Withdrawn | Apr 2025 |
| AG1-451 | Curdsville DP-Willis Mt. 115 kV | 115 | 20 | Battery | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Buckingham County, VA
- Bremo: 3 active, 2,185 MW of 4 filed
- Bremo-Scottsville: 1 active, 89.7 MW of 2 filed
- Bear Garden: 2 active, 83.2 MW of 2 filed
- Curdsville-Willis Mtn: 1 active, 60 MW of 2 filed
- Buckingham: 1 active, 13.5 MW of 2 filed
- Buckingham-Bremo: none active of 4 filed
- Scottsville - Bremo: none active of 3 filed
- Scottsville - CVEC Delivery Point: none active of 2 filed