Buckingham substation interconnection queue

1 active project totalling 13.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
13.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB2-045 Buckingham 34.5kV 34.5 13.5 Solar In Service
AC2-071 Buckingham IIK 35 13.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.