Buckingham substation interconnection queue
1 active project totaling 13.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Buckingham as the point of interconnection, all in Buckingham County, VA.
Target commercial operation dates as filed run from Dec 2017 to Dec 2021 (2 filings).
1active projects
13.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-045 | Buckingham 34.5kV | 34.5 | 13.5 | Solar | In Service | Dec 2017 |
| AC2-071 | Buckingham IIK | 35 | 13.3 | Solar | Withdrawn | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Buckingham County, VA
- Bremo: 3 active, 2,185 MW of 4 filed
- Bremo-Scottsville: 1 active, 89.7 MW of 2 filed
- Bear Garden: 2 active, 83.2 MW of 2 filed
- Curdsville-Willis Mtn: 1 active, 60 MW of 2 filed
- Buckingham-Bremo: none active of 4 filed
- Curdsville DP-Willis Mt.: none active of 3 filed
- Scottsville - Bremo: none active of 3 filed
- Scottsville - CVEC Delivery Point: none active of 2 filed